5/17/2013
More visible progress after a lengthy pause. The crew got the deck partially framed, the garage partially prepped for concrete, and the escape window partially installed in the basement bedroom. There was some semi final landscape sculpting and repair of some heavy truck damage to the driveway and two new culverts were installed under it to allow for better drainage. In spite of all our recent warm weather they still hit ice under the garage floor when they were putting in the drain, so we will have to wait another week or two before we can pour the concrete floor.
|
Deck ready for floor board and front step install. | |
|
Smoothed over and debris cleared up. Looks much better than the mud field we had earlier. |
|
|
|
looking a little closer to being a house. |
|